No Products in the Cart
Preparing Cafés, Restaurants, Bars and Hospitality Venues for the Summer Beverage Rush
KEY TAKEAWAYS
Summer begins in December, making the weeks before the warmer season a practical time to review beverage production and commercial ice-making capacity.
• The latest Bureau of Meteorology seasonal outlook indicates above-average temperatures are likely across much of the country during the December to February period.
• Hot weather can increase demand for iced coffee, cold beverages, cocktails, mocktails, smoothies and other chilled products.
• Ice should be planned around peak beverage demand rather than an average quiet trading day.
• The Hoshizaki KM-40C HC is a commercial crescent ice maker with published production of up to 41 kg per 24 hours under specified test conditions and approximately 16 kg of storage capacity.
• The Hoshizaki KM-40C HC is designed for commercial environments with features including automated cleaning, front-accessible air filtration and stainless-steel construction.
• The best commercial ice machine is not necessarily the largest one. It is the machine that matches the venue's peak demand, available space, utilities and workflow.
• Reviewing ice production before summer can help hospitality operators reduce the risk of beverage-service bottlenecks during busy periods.

The first hot Saturday
It starts innocently.
The morning is quiet. The doors open, the coffee machine warms up, the pastry cabinet is filled, and the first few customers arrive for their usual morning coffee.
Then, sometime around 10:30, the temperature starts climbing.
A customer walks in and asks, "Can I get that iced?"
Then another.
Then someone orders an iced latte. Another wants an iced long black. A family orders cold drinks for everyone. A few takeaway orders come through. The blender starts running.
The barista reaches for the ice scoop.
And then someone looks inside the ice bin.
"We're going to need more ice."
Suddenly, something that nobody was thinking about an hour ago has become one of the most important things happening behind the counter.
Because when the weather heats up, customers don't just change what they wear.
They change what they order.
Iced coffee. Cold brew. Iced chocolate. Smoothies. Milkshakes. Soft drinks. Cocktails. Mocktails. Chilled water.
For cafés, restaurants, bars, hotels, bakeries and takeaway venues, ice can quickly become a critical part of the service workflow.
And that raises an important question before the summer rush arrives:
Can your commercial ice machine keep up?
For hospitality businesses, seasonal changes can appear first on the menu.
As temperatures rise, customers naturally look for ways to cool down. Iced coffees become more popular. Cold drinks move faster. Outdoor dining becomes more appealing. Takeaway beverage orders can increase. Restaurants and bars may see greater demand for cocktails, spritzes, mocktails and chilled beverages.
The latest Bureau of Meteorology outlook indicates that maximum and minimum temperatures are very likely to be above average across most of the country during December 2026 to February 2027.
For a café owner, restaurant manager, bar operator or catering business, this is more than a weather story. It is a reminder to review the equipment that supports the summer menu.
One of the easiest pieces of equipment to overlook is the commercial ice machine.
Imagine a busy café on a warm afternoon.
The espresso machine is busy. The kitchen is busy. The takeaway counter is busy.
But the biggest problem isn't the coffee machine.
It isn't the oven.
It isn't even the staff.
It's the ice.
The team starts rationing it. Someone checks whether there is another bag in storage. A staff member has to leave the service area to find more. A customer waits. Another order comes through.
A simple shortage of ice has now started affecting the entire workflow.
This is why commercial ice production deserves the same planning attention as commercial refrigeration, commercial coffee equipment, commercial ovens and other hospitality equipment.
You cannot make today's missing ice after the customer has already ordered an iced drink.
The production needs to happen ahead of demand.
A venue can look perfectly prepared on a normal weekday and still struggle during a hot weekend. Consider a café selling iced lattes, iced long blacks, cold brew, iced chocolate, milkshakes, smoothies, soft drinks, bottled water served with ice and seasonal cold beverages.
Now add takeaway orders and a warm-weather promotion.
The ice requirement can change significantly.
Restaurants have a different pattern. A restaurant may need ice for beverages, seafood presentation, chilled ingredients, bar service and events.
Bars can have even greater beverage-related ice demand because ice is part of the product itself.
Hotels, catering businesses, function venues and entertainment spaces may also experience large fluctuations in ice consumption.
The important lesson is simple: Don't calculate your commercial ice machine requirement from the quietest day. Plan around the busiest realistic period.

For businesses looking to improve their commercial ice production, the Hoshizaki KM-40C HC offers a purpose-built option for hospitality applications.
The machine is a self-contained Crescent Edge ice maker with published production of up to 41 kg of ice per 24 hours at 21°C air temperature and 15°C water temperature.
At 32°C air temperature and 21°C water temperature, published production is approximately 33 kg per 24 hours.
It has approximately 16 kg of storage capacity.
Those figures are important because ice production varies with operating conditions. A commercial ice maker should always be evaluated using realistic ambient and water temperatures rather than relying only on its headline daily production number.
For a venue preparing for summer, that distinction matters.
Ice is not simply ice.
Different shapes, sizes and densities can behave differently in beverages.
The Hoshizaki KM-40C HC produces individual crescent-shaped ice designed to be hard and slow-melting.
For cafés and beverage-focused hospitality businesses, this can be useful for drinks where maintaining cold temperature and beverage presentation matters.
Think about an iced latte sitting on a takeaway counter. Think about a cocktail being served during afternoon service. Think about a cold drink travelling with a customer.
The ice becomes part of the customer experience.
That is why selecting a commercial ice maker should involve more than asking how many kilograms it can produce. Consider the type of ice, storage capacity, production rate, peak demand, operating temperature, cleaning requirements, installation requirements and available space.
THE DIFFERENCE BETWEEN PRODUCTION CAPACITY AND REAL-WORLD DEMAND
One of the most important concepts when selecting a commercial ice machine is understanding that daily production capacity is not the same thing as guaranteed output in every condition.
The Hoshizaki KM-40C HC's published figures are based on specific air and water temperatures.
At cooler conditions, production can be higher. As operating conditions become warmer, production can decrease.
This is why a venue should ask: How much ice do we use on our busiest day? How much ice do we use during our busiest hour? How much of our beverage menu depends on ice? How much storage do we need between production cycles? What happens when temperatures are higher than normal?
Answering those questions gives a much better picture of the right commercial ice machine capacity.
THE HIDDEN COST OF RUNNING OUT OF ICE Running out of ice may sound like a small inconvenience.
But the cost is not simply the price of the ice.
It can include staff time, service delays, disrupted workflow, customer frustration and lost sales opportunities.
Imagine a barista having to stop making drinks to search for an emergency supply. Imagine a restaurant team discovering during dinner service that there isn't enough ice for the beverage station. Imagine a bar running low during a busy evening.
The equipment problem becomes a service problem. And the service problem can become a customer-experience problem.
A COMMERCIAL ICE MACHINE IS PART OF THE BEVERAGE WORKFLOW
An ice machine does not work alone.
Water enters the machine. Ice is produced. Ice is stored. Staff collect the ice. Ice moves to the beverage station. Drinks are prepared. Customers receive their drinks.
When any part of this chain becomes unreliable, the beverage operation can slow down.
That means placement matters too. Before installation, consider where staff prepare drinks, where the ice storage is located, how far the ice needs to travel, whether the machine has appropriate ventilation and whether water, drainage and electrical requirements can be accommodated.
A machine that produces plenty of ice but is positioned poorly can still create unnecessary workflow problems.
WHAT SHOULD CAFE OWNERS CONSIDER BEFORE BUYING? Before purchasing a commercial ice maker for a cafe, consider:
The right machine is the one that fits the operation, not simply the one with the biggest number on the specification sheet.
WHAT ABOUT RESTAURANTS AND BARS? Restaurants and bars can have very different ice requirements from cafés.
A restaurant may use ice for beverages, food presentation, chilled service and events. A cocktail bar may use ice continuously throughout service. A venue with outdoor dining may experience higher demand on warm evenings. A hotel may need to consider multiple service areas. A catering company may have demand that changes dramatically from one event to another.
This is why commercial ice machine selection should begin with the business model. Ask what the ice is being used for. Then calculate the demand. Then select the equipment.
Preparing for summer does not mean buying an ice machine and forgetting everything else.
A beverage-heavy business should look at the entire cold-service workflow.
Is the commercial refrigerator large enough? Can the bar or coffee station handle increased orders? Is the commercial coffee machine suitable for the expected volume? Is the blender or food preparation equipment keeping up? Is the dishwasher fast enough to handle the extra glassware? Is there enough cold storage? Can the team access ice without crossing the busiest part of the kitchen?
Summer can expose weaknesses across the whole operation. That makes seasonal equipment planning useful for the entire kitchen.
The Hoshizaki KM-40C HC combines commercial ice production with a compact self-contained format.
Its published features include:
These features are relevant to hospitality operators who want equipment designed around commercial use. The machine should still be assessed against the venue's specific installation conditions and actual ice requirements before purchase.
The smartest time to review ice capacity is not when the ice bin is empty. It is before the first major hot-weather rush.
Look at your previous summer beverage sales. Look at your current iced drink menu. Check your peak trading days. Ask staff where current bottlenecks occur. Review how much ice you buy, how often you refill it and whether emergency ice purchases happen.
If you already know your current machine struggles during warm weather, waiting until the problem happens again is unlikely to make the next season easier.
It is now Saturday afternoon.
The temperature is climbing. The café is full. A queue has formed at the counter. The barista is making iced coffees one after another. The kitchen is sending food. The dishwasher is running. The team is moving quickly.
Someone reaches for the ice scoop.
There is still plenty of ice.
No one stops. No customer notices.
And that is exactly how good commercial equipment should work.
It should support the team quietly in the background.
The customer doesn't need to know there is a commercial ice maker producing ice behind the scenes. They simply need their cold drink to arrive cold, quickly and consistently.
Summer has a funny way of exposing weaknesses in a hospitality operation.
The queue gets longer. The drinks get colder. The staff move faster. And suddenly, the things you barely noticed during cooler months become essential.
Ice is one of them.
So before the warmer months arrive, take a look behind the counter.
Ask your team:
Do we have enough ice?
Can our commercial ice machine keep up during peak service?
Are we planning for warmer operating conditions?
Is our ice storage capacity enough?
Could our current ice supply become a bottleneck?
What happens when everyone orders their drink iced?
The smartest time to prepare for a summer rush isn't when the ice bin is empty.
It's before the first hot Saturday arrives.
When does summer start?
Summer officially begins in December, with December, January and February considered the summer months.
The latest seasonal outlook indicates that above-average maximum and minimum temperatures are likely across much of the country during the December to February period.
The Hoshizaki KM-40C HC can produce up to approximately 41 kg of ice per 24 hours under the specified 21°C air and 15°C water conditions. At 32°C air and 21°C water, published production is approximately 33 kg per 24 hours.
The machine has approximately 16 kg of storage capacity.
It produces individual crescent-shaped ice designed to be hard and slow-melting.
It can be considered for cafés and other hospitality venues where its published production and storage capacity match the business's peak demand, space and installation requirements.
Consider peak ice demand, production capacity at realistic temperatures, storage capacity, ice type, available space, water supply, drainage, electrical requirements, cleaning, maintenance and future business growth.
Why is ice production important for cafes? Ice supports iced coffee, cold brew, smoothies, milkshakes, soft drinks and other chilled beverages. During warmer periods, increased beverage demand can make ice production a critical part of service capacity.
Start with actual consumption during your busiest service periods. Review the number of iced beverages sold, the amount of ice used per drink, other uses for ice and expected increases during warmer weather. Compare this with the manufacturer's production and storage specifications under realistic operating conditions.
Yes. Reliable ice production can reduce the need for emergency ice purchases, unnecessary staff movement and interruptions at the beverage station. The benefit depends on correct machine sizing, installation, maintenance and workflow design.